Module 1 — Standards & Layout
Objective: plan a serviceable, safe electrical system.
Prereqs: Drivetrain/mechanism footprint, battery and pneumatics needs.
Steps
- Place battery, main breaker, PDH/PDP, radio, motor controllers, and pneumatics (if used) with service loops.
- Plan CAN and power paths; minimize noise near signal runs.
- Reserve mounting and strain relief points; ensure breaker and radio access.
- Check weight distribution; keep heavy items low and central.
- Plan ventilation and protection for radio; avoid metal enclosures blocking signal.
Deliverables
- Layout sketch with device locations, wire gauges, and routing paths.
- Breaker map and CAN ID plan.
Resources
- REV wiring guide: docs.revrobotics.com/firstrobotics/wiring-guide
Instructions (numbered)
- Sketch component placement (battery, main breaker, PDH/PDP, radio, controllers, pneumatics) with service loops.
- Plan power paths and CAN topology; keep power and signal separated where possible.
- Set weight distribution (heavy low/central); ensure breaker/radio access.
- Plan ventilation and radio visibility (avoid metal shielding); add strain relief anchor points.
- Create breaker map and CAN ID plan; review with mech/CAD for clearances.
Example
- Battery low/center, main breaker near bumper opening, PDH mid-board, radio elevated with clear line-of-sight, CAN in daisy-chain with branch to front sensors.
Best practices
- Keep high-current runs short; avoid sharp bends.
- Leave service slack; anchor wires near moving parts.
- Plan ground paths and isolation from metal edges.
Common mistakes
- Burying radio/PDH under mechanisms; no access.
- No strain relief anchors; wires pulled at connectors.
- Overlapping power and signal causing noise.
Checklist
- Layout sketch complete
- Power/CAN paths planned
- Access to breaker/radio confirmed
- Strain relief points included
- Breaker map and CAN IDs drafted
Recommended tools
- Layout template, tape measure, adhesive anchors/zip ties, Velcro/fasteners for mounting, labeling supplies.
Sample log (template)
- Date:
- Layout changes:
- Breaker/CAN updates:
- Risks:
- Decisions:
Photos/diagrams
- [Placeholder: board layout sketch with annotations]