Skip to main content

Postmortem (Template)

Logs must contain:

  1. The requirement being validated.
  2. The data collected.
  3. Outcome and action taken.

Linked Subsystem/Requirement

Subsystem:
Requirement ID:
Design intent:

Event/season

  • Event:
  • Record:
  • Goals vs. outcomes:

What went well

What went badly

Root Cause

Fix Applied

Was a standard or requirement updated?

Yes / No

Changes for next event/season

Actions & owners

Checklist

  • Wins and failures captured
  • Changes identified
  • Actions with owners/dates assigned
  • Standards/requirements update noted
  • Data/logs:
  • Code/CAD updates:
  • Photos/videos:

Data to Collect

  • Voltage and current
  • Setpoint vs measured value
  • Pose/heading if applicable
  • Battery voltage
  • Temperature of motors/controllers
  • Errors/faults/warnings
  • Any relevant sensor streams