Module 5 — Test & Iterate
Objective: prove durability and performance, then feed fixes back to design.
Prereqs: Assembled subsystem.
Steps
- Run stress and endurance tests; track heat, slip, stall, deformation.
- Log failures and suspected causes; apply fixes (tension, wrap, bracing, ratios).
- Re-test and update documentation and CAD as needed.
- Check fasteners post-test for loosening; reapply threadlocker if needed.
- Validate that changes still clear bumpers, frame perimeter, and wiring paths.
Deliverables
- Test report with pass/fail, fixes applied, and approved revisions for CAD/build.
- Updated spares list and maintenance schedule based on failures seen.
Resources
- Reuse drivetrain/mechanism calculators for any ratio changes.
Instructions (numbered)
- Plan tests (stress/endurance); measure heat, slip, stall, deformation.
- Run tests; log failures and suspected causes with data/photos.
- Apply fixes (tension, wrap, bracing, ratios); re-test and compare results.
- Check fasteners after testing; reapply threadlocker if needed.
- Verify rules/clearances (bumpers/frame/wiring) after changes; update CAD/docs/spares.
Example
- Arm test: overheated at 50% duty after 2 min; fix by increasing gear ratio and adding vent holes; retest shows stable temps.
Best practices
- Instrument tests (temp, current, video) to capture evidence.
- Test longer than match duration to catch endurance issues.
- Update spares and maintenance based on observed failures.
Common mistakes
- Short tests that miss endurance failures.
- Not retesting after fixes; not checking fasteners afterward.
- Forgetting to update CAD/docs/spares.
Checklist
- Test plan defined
- Data captured (temps, current, video)
- Failures logged
- Fixes applied and retested
- Rules/clearances rechecked
- Docs/CAD/spares updated
Recommended tools
- IR thermometer or temp sensors, current logging, camera, torque tools, checklists.
Sample log (template)
- Date:
- Test type:
- Observations/data:
- Fixes applied:
- Retest results:
- Updates made:
Photos/diagrams
- [Placeholder: test setup and plots before/after]